When can a new concrete surface carry traffic?
Agree separate access milestones for foot traffic, vehicles and the intended load, using the actual concrete design and project conditions.

A newly placed surface should not receive traffic simply because it looks dry. Ask the contractor for access milestones appropriate to the actual mix, conditions and intended load. Foot traffic and vehicle use are different handover decisions.
Define the loads before the pour
Tell the contractor whether the surface will serve pedestrians, ordinary vehicles or heavier equipment. Include the planned access date and any unavoidable operational need. The design and protection plan should address that use before work starts.
Ask how the readiness decision will be communicated and who may release each access restriction. Do not substitute a universal number of days from another project or judge readiness by colour alone.
Keep restrictions practical
Plan another parking or access arrangement for the restricted period. Tell occupants and delivery users which routes remain available. Removing barriers for a brief visit can defeat an otherwise clear protection plan.
At handover, retain the care instructions and the approved access milestones. If loading requirements change, ask for confirmation rather than assuming a light-use release permits every planned load.